About the role
The team oversees the progression of vessel construction through the shipyard. The Master Planner creates and updates the master timeline, identifying key tasks and dependencies across all disciplines and work areas.
Our summary of the posting; the original is on the Saronic careers page.
What the posting requires
- Required
- US citizenship
- Integrated master schedule
- Analytical skills
- CPM-based scheduling tools
- Critical path analysis
- Primavera P6
- Schedule risk assessment
- MS Project
- Capacity planning
- Scheduling tools
- Preferred
- PLM systems
- Schedule health reporting
- ERP systems
- Dashboards
- Data integration
- S-curves
These tags are our reading of the posting. They can miss something; the original posting is the reference.
