About the role
The commissioning team supports the build-out of data center infrastructure. The controls superintendent oversees the verification and checkout of building management systems and electrical power monitoring systems during commissioning. This role involves running point-to-point tests, managing the controls schedule, and ensuring documentation and safety standards are met.
Our summary of the posting; the original is on the Fluidstack careers page.
What the posting requires
- Required
- Tridium
- EPMS
- Sequences of operations
- Vendor checkout
- Niagara
- Schneider
- Points lists
- Data analysis
- ALC
- Preferred
- Data center commissioning
These tags are our reading of the posting. They can miss something; the original posting is the reference.
