What the posting requires
- Required
- Engineering drawings
- Precision measuring instruments
- Nonconformance documentation
- Technical specifications
- Dimensional inspection
- Inspection records
- GD&T
- Quality control processes
- AS9100
- Preferred
- CMM
- ERP
- Root cause analysis
- Optical measurement systems
- MES
- Corrective actions
These tags are our reading of the posting. They can miss something; the original posting is the reference.
