About the role
The team supports large-scale data center construction projects. The estimator develops and manages cost plans and estimates for civil, structural, architectural, and landscaping work. This involves analyzing costs, assessing design changes, and presenting updated cost plans throughout the project lifecycle.
Our summary of the posting; the original is listed on Himalayas.
What the posting requires
- Required
- Preferred
These tags are our reading of the posting. They can miss something; the original posting is the reference.
Add your resume
Drop a PDF here, or
PDF or plain text, up to 10 MB.
Nothing is kept until you say so.