About the role
The team builds and maintains construction schedules for field use. The scheduler develops baseline schedules, updates them with progress, identifies risks, and analyzes the impact of changes and delays. This role requires understanding construction means and methods to ensure schedule accuracy and drive project timelines.
Our summary of the posting; the original is on the SpaceXSI careers page.
What the posting requires
- Required
- Smartsheet
- MS Project
- Construction scheduling
- DCMA 14-point
- GC
- USACE
- CM
- Owner's project controls
- Specialty contractor
- Preferred
- Forensic delay analysis
- Cost/resource loading
- Last Planner
- BIM 4D
- Power BI
- Time-impact analysis
These tags are our reading of the posting. They can miss something; the original posting is the reference.
