Skip to content

What the posting requires

Required
  • Security clearance
  • RF
  • Antenna modeling
  • Link budget analysis
  • Array modeling
  • Linearity
  • RF communications
  • Navigation systems
  • Components
  • Bachelor
Preferred
  • Worst case analysis
  • Reliability analysis
  • FMECA
  • Thermal analysis
  • Derating analysis
  • Extensive

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Add your resume

Drop a PDF here, or

PDF or plain text, up to 10 MB.

Nothing is kept until you say so.