About the role
The team builds and expands AI cloud infrastructure. The construction foreman oversees daily site operations, directing trade crews and ensuring work aligns with project plans and safety standards. This role involves coordinating installations, managing materials, and documenting progress on active construction sites.
Our summary of the posting; the original is on the Lambda careers page.
What the posting requires
- Required
- Construction drawings
- Mobile tools
- Read construction drawings
- Redlines
- Procore
- Physical ability
- Single lines
- Photo documentation
- Interpret specifications
- Preferred
- Commissioning
- Pre-functional checklists
- Punch list closeout
- Trade apprenticeship
- NFPA 70E
- First Aid
These tags are our reading of the posting. They can miss something; the original posting is the reference.
