What the posting requires
- Required
- Protection and control systems
- Protection and control schemes
- Protective relays
- Short-circuit studies
- Fault analysis
- Installation oversight
- Troubleshooting
- Documentation
- Technical support
- Relay systems
- Preferred
- Relay settings software
- Power system analysis tools
- SCADA systems
- SEL AcSELerator
- ETAP
Preferred experience: 3+ yrs
These tags are our reading of the posting. They can miss something; the original posting is the reference.