What the posting requires
- Required
- Substation design
- Bill of materials
- Construction support
- High-speed internet
- Physical layout
- Substation
- Power transformers
- Substation construction
- 500 Mbps download
- Protective design
- Preferred
- Substation physical design
- Substation controls design
- SCADA
- Telemetry
- Communication settings
Preferred experience: 10+ yrs
These tags are our reading of the posting. They can miss something; the original posting is the reference.