What the posting requires
- Required
- Security clearance
- Mbom
- MES
- Engineering drawings
- EBOM
- PDM
- Technical specifications
- Bom
- Product Data Management
- Preferred
- ERP
- CAD
- SPC
- Oracle
- PLM
- Statistical process control
These tags are our reading of the posting. They can miss something; the original posting is the reference.
