What the posting requires
- Required
- US work authorization
- Wire harness
- PPAP
- International travel
- FPC/FFC assembly
- RCCA
- 30% travel
- Design rules
- Fishbone analysis
- Process mapping
- Preferred
- Global travel
- 30-40% travel
These tags are our reading of the posting. They can miss something; the original posting is the reference.
