What the posting requires
- Required
- Critical infrastructure
- BMS
- Engineering drawings
- Microsoft Word
- Electrical distribution
- EMS
- One-line diagrams
- Excel
- UPS
- Preferred
- AutoCAD
- Design tools
- Data Center standards
- Telecommunications standards
- TIA
- BICSI
These tags are our reading of the posting. They can miss something; the original posting is the reference.