What the posting requires
- Required
- Bid Analysis Sheets
- Change Control Forms
- Cost Estimating Software
- Take-off Software
- Construction industry
- Procurement
- Value management
- Value engineering
- Bachelor's degree
- Preferred
- RICS
- Construction consultancy
These tags are our reading of the posting. They can miss something; the original posting is the reference.