What the posting requires
- Required
- Security clearance
- 480v
- Conduit
- Electrical testing
- Construction drawings
- Lockout/tagout
- Hand tools
- Energization
- Documentation
- Preferred
- Print reading
- Drawings
- OSHA 30
- Industrial construction
- Large-scale construction
- Manufacturing construction
These tags are our reading of the posting. They can miss something; the original posting is the reference.
