Skip to content

What the posting requires

Required
  • US citizenship
  • Engineering drawings
  • Sourcing strategies
  • Supplier network
  • Fabrication projects
  • Vendor capabilities
  • Contract documents
  • Contract management
  • Contract interpretation
Preferred
  • ERP
  • Bill of materials
  • Forecasting
  • Excel
  • MRP
  • Work orders

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.