About the role
The Stage Manufacturing team constructs the rocket's main structures. This engineer creates and improves testing methods for mechanical, electrical, and pneumatic components. They offer direct assistance on the production floor, examine test results, and work with other departments to fix problems and enhance output.
Our summary of the posting; the original is on the Relativity Space careers page.
What the posting requires
- Required
- Test procedures
- Safety standards
- Electromechanical assembly
- Mechanical
- Test hazards
- Pneumatic assembly
- Electrical
- Mitigations
- Electrical functional checkouts
- Preferred
- Testing processes
- Industry test standards
- Test automation
- Electrical Test Equipment
- Pressure Test Equipment
- Definition
These tags are our reading of the posting. They can miss something; the original posting is the reference.
