What the posting requires
- Required
- Contract interpretation
- Technical writing
- Analytical
- Spreadsheet
- Document control
- Eastern Time coordination
- Project records analysis
- Schedule impact analysis
- Claim reconciliation
- Cost records
- Preferred
- Delay analysis
- CPM Scheduling
- Procore
- Primavera P6
- Microsoft Project
- Bluebeam
These tags are our reading of the posting. They can miss something; the original posting is the reference.