Skip to content

What the posting requires

Required
  • Contract interpretation
  • Technical writing
  • Analytical
  • Spreadsheet
  • Document control
  • Eastern Time coordination
  • Project records analysis
  • Schedule impact analysis
  • Claim reconciliation
  • Cost records
Preferred
  • Delay analysis
  • CPM Scheduling
  • Procore
  • Primavera P6
  • Microsoft Project
  • Bluebeam

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.