What the posting requires
- Required
- Primavera P6
- MS Project
- Procore
- Cost management systems
- MEP design
- MEP construction
- Modular construction
- QA/QC
- Commissioning
- Preferred
- Master's degree
These tags are our reading of the posting. They can miss something; the original posting is the reference.