What the posting requires
- Required
- RFI management
- AutoCAD
- Revit MEP
- Clash detection
- 2D drawing review
- Construction site coordination
- BIM coordination
- Navisworks
- 3D drawing review
- Preferred
- Control panel systems
- PLC integration
- Shop drawing production
- Construction sequencing
- Expert
- Specialist
These tags are our reading of the posting. They can miss something; the original posting is the reference.