Skip to content

What the posting requires

Required
  • Civil
  • Safety plans
  • Long-lead equipment
  • Primavera P6
  • Racking
  • Subcontractors
  • SCADA
  • MS Project
  • PV
  • Documentation
Preferred
  • Gen-tie
  • OSHA 30
  • Multi-site
  • Concurrent delivery

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.