What the posting requires
- Required
- Civil
- Safety plans
- Long-lead equipment
- Primavera P6
- Racking
- Subcontractors
- SCADA
- MS Project
- PV
- Documentation
- Preferred
- Gen-tie
- OSHA 30
- Multi-site
- Concurrent delivery
These tags are our reading of the posting. They can miss something; the original posting is the reference.
