Skip to content

What the posting requires

Required
  • MRP
  • Schedule adherence
  • Shortage prediction
  • Data
  • Manufacturing
  • Material constraints
  • Communication
  • Replan
Preferred
  • NetSuite
  • S&OP
  • Excel
  • ERP
  • SQL
  • Low-volume

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.