What the posting requires
- Required
- Electrical plans
- 3D drawing
- Study file delivery
- Project needs analysis
- Project cost estimation
- Study monitoring
- CAD software
- RTE graphical referential
- Diagrams
- Preferred
Nothing listed as preferred.
These tags are our reading of the posting. They can miss something; the original posting is the reference.