Skip to content

About the role

The team builds and operates data centers for AI workloads. The construction scheduler develops and manages project timelines using Primavera P6, collaborating with various teams to ensure alignment and accuracy. This role involves risk assessment, progress tracking, and providing recovery plans when needed.

Our summary of the posting; the original is on the Crusoe careers page.

What the posting requires

Required
  • Float management
  • Primavera P6
  • Critical path method
  • Smartsheet
  • CPM
  • Microsoft Office
  • Sequencing logic
  • Bachelor's degree
  • Engineering
Preferred
  • Schedule risk assessment
  • Critical path analysis
  • Schedule reporting
  • Scope alignment
  • Recovery plans
  • Schedule tracking

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.