What the posting requires
- Required
- MPS/MRP logic
- Finite capacity planning
- ERP scheduling modules
- Acumatica
- Bachelor's degree
- Supply Chain Management
- Industrial Engineering
- Operations
- Production planning
- Preferred
- Acumatica ERP
- High-tech manufacturing
- Modular data center production
- Complex assembly
- APICS
- ASCM
These tags are our reading of the posting. They can miss something; the original posting is the reference.
