Skip to content

What the posting requires

Required
  • MPS/MRP logic
  • Finite capacity planning
  • ERP scheduling modules
  • Acumatica
  • Bachelor's degree
  • Supply Chain Management
  • Industrial Engineering
  • Operations
  • Production planning
Preferred
  • Acumatica ERP
  • High-tech manufacturing
  • Modular data center production
  • Complex assembly
  • APICS
  • ASCM

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.