Skip to content

What the posting requires

Required
  • Floor planning
  • Physical design validation
  • Clock trees
  • Physical design flow automation
  • ICC
  • SoC Architecture
  • RTL to GDS
  • Synthesis
  • Place and route
Preferred

Nothing listed as preferred.

These tags are our reading of the posting. They can miss something; the original posting is the reference.

Your fit

Add your resume PDF to check it against this posting.

About a minute.

No account. Your resume is deleted when the verdict appears.