What the posting requires
- Required
- PFMEA
- Factory floor
- Control plans
- Process problem diagnosis
- SPC
- Factory telemetry
- Process capability
- Gauge R&R
- DFM
- Preferred
- Lean manufacturing
- Continuous improvement
- Value stream mapping
- Kaizen
- Six Sigma
- Servers
These tags are our reading of the posting. They can miss something; the original posting is the reference.
