What the posting requires
- Required
- Issue tracking
- Containment
- Root Cause Analysis
- Corrective Action
- Diagnosis
- Inspection process
- Inspection tools
- Continuous improvement
- Problem solving
- Preferred
- Quality management systems
- ERP systems
- SAP
- MES
- JIRA
- ASQ Certification
These tags are our reading of the posting. They can miss something; the original posting is the reference.
