What the posting requires
- Required
- Infrastructure projects
- Permitting
- Design funding
- Project schedule coordination
- Resource requirements
- Lean construction
- Feasibility studies
- Equipment Install projects
- Construction documents
- Project schedule
- Preferred
- Electrical system design
- Battery systems
- UL 9540
- Interconnection requirements
- Electrical protection
Preferred experience: 5+ yrs
These tags are our reading of the posting. They can miss something; the original posting is the reference.
